image: Technical Information heading *

This building has been purposely built for arena tour pre–production rehearsals. The Litestructures team have been in the live production industry for more than 20 years. We fully understand the industry – how it works, the pitfalls, the needs, the timings and the budgets. This is the only place where you can have uniterupted, full blown, cost effective unrestricted rehearsal time and space.

The Rehearsal Arena

  • 54ft high / 5 floors
  • 1200A 3 phase power
  • State of the art, high load capacity gantry
  • Award winning team
  • The rehearsal floor space is 42m (138ft) x 39m (128ft) x 16.5m (54ft to underside of gantry)
  • 4 electronically operated, vertical opening access doors 6m x 4.5m
  • 6 external fire exits
  • Fully walkable gantry
  • 100tn loading per 4 bays with secondary trusses for flexible plots
  • On site fabrication
  • Adjacent rental division
  • Car parking spaces in excess of 40 vehicles
  • External power – 16 amp 3 phase (enough for 3 tour buses)
  • Turning circle for easy loading of 40ft trucks with the facility to back into the arena space and off load inside the arena space

The facility has been built on site, adjacent to the litestructures manufacturing and rental business in order to deliver convenient , low cost, quick alterations often required during rehearsal. Our renatl department offers the largest stock of Litedeck and medium weight trussing in the UK, in addition to an extensive range of lifts, revolves and rolling risers. Our on site manufacturing facility can design and fabricate any custom items required last minute with no carriage fees, immediate response and industry minded house staff.

The LItestructures team are experienced and innovative. They provide solutions for creative production minds and their installations team are expert problem solvers with a ‘can do’ attitude.

Studio Manager – Brent Woods

Facilitator and point of contact for booking enquiries - contact

House Rigger – Harry Box (Concert Lights UK ltd)
Also responsible for National Indoor Arena , Sheffield Arena, Nottingham Ice Centre and Telford International Centre.

Electronics Engineer – Mark Jackson

Highly experienced in developing ingenious solutions for touring stage sets.

image: PDF icon Litestructures Studio Technical Specification 1

image: PDF icon Litestructures Studio Technical Specification 2

image: PDF icon Litestructures Studio Technical Specification 3

image: PDF icon Litestructures Studio Technical Specification 4

image: PDF icon Litestructures Studio Technical Specification 5

Ground floor office facilities

Catering - designed to provide the flexibility required by touring caterers. Includes 1 double sink, tables and chairs to seat 50 people and power supply

Production Offices – with telephone system and wireless broadband

Reception Area – fully programmableelectronic card entry to all doors in the facility

Toilets – fully fitted with WCs and wash basins

First floor office facilities

Dressing rooms – 6 dressing rooms all inclusive of showers and WC Dressing room 5 has a plasma screen, Sky TV and stereo system. All rooms have telephone and power sockets.

Laundry room – with washing machine and dryer

Access – restricted by electronic entry sytem

Toilets – fully fitted with showers, WCs and washbasins

Directions

From East and West – Take M62 to junction 33, head south on A1.

From North – Take A1 south, continuing past M62 junction 33. Taking the south Kirkby / South Emsall turn off: 1st junction past the barnsdale bar services. Loop over the A1, turn left and then first right (sign posted Netto) continue to Dale Lane roundabout and go over roundabout (sign posted Langthwaite Grange Industrial Estate).

From the roundabout continue to the traffic lights, go straight on down the hill and past the school. On reaching the next T-junction (after about 1 mile) turn right and continue to the next traffic lights. Turn left onto industrial estate and then turn left into Lidgate crescent. You will see the Litestructures sign 75m on your right hand side.

From South – Leave A1(M) at junction with A638 taking the left slip lane signpost to Wakefield. Continue on A638 to Dale Lane roundabout, turning left at roundabout (signposted South Kirkby).

> Local Facilities


*
 
Enquiries and Bookings
image: ipix 360 Litestructures Studio

Click on the image below to launch an IPIX 360° Viewer of the Rehearsal Arena at Litestructures Studios.

(Note: if you have a popup blocker installed, hold down CTRL when you click on the image.)

image: ipix thumbnail image
image: Latest News
01/03/2008 Litestructures Studios has the X Factor
01/12/2007 Record breaking occupancy for the end of the year at the Studio
05/11/2007 Stereophonics enjoy their stay in the Studio
01/07/2007 Litestructures Studios host new major acts
29/05/2007 Litestructures Studios celebrates second anniversary with record occupancy level
01/04/2007 Faithless perform secret show at Litestructures for Channel 4
01/03/2007 Official opening for the Litestructures Studios by HRH Earl of Wessex
19/02/2007 Westlife on the Road
13/11/2006 Pussycat Dolls sensation
13/11/2006 Rihanna struts her stuff
06/11/2006 It feels like dancing with the Scissor Sisters!
17/10/2006 Litestructures finds its 'MUSE' in the Studio rehearsal!
20/08/2006 By George, it's George
22/04/2006 Robbie Fever
17/03/2006 From Big Bands to Commercials
20/01/2006 Cause for Celebration
07/12/2005 Some Canadian Sun for the Studio in December
07/11/2005 Prodigy
17/10/2005 World tour rehearsal for Franz Ferdinand
01/05/2005 Coming in from the cold!
Copyright © 2006 Litestructures, all rights reserved e: sales@litestructures.co.uk  t: +44 (0)1977 659 800
Registered in England: No. 2584106
Litestructures Ltd, Langthwaite Grange Business Park, South Kirkby, Wakefield, West Yorkshire WF9 3NR