image: Tour of Britain heading * *

We were approached to design a Start/Finish line gantry for the Tour de Britain, one that could be transported daily to different venues along the route. The structure had to be large enough to display graphic panels.

Given its designated use, one of the main criteria was that the structure was quick and easy to dismantle and reassemble. We determined therefore that the design should be based around Litestructures Litepro 3, which is pin fastened and offers excellent strength-to-weight ratios

Leisure Projects

*
 
Copyright © 2006 Litestructures, all rights reserved e: sales@litestructures.co.uk  t: +44 (0)1977 659 800
Registered in England: No. 2584106
Litestructures Ltd, Langthwaite Grange Business Park, South Kirkby, Wakefield, West Yorkshire WF9 3NR
image: small case study image 1 * image: small case study image 2
*
image: small case study image 3 * image: blank case study thumbnail 4
image: large case study image
image: large case study image
image: large case study image
image: large case study image